

next time maybe just release it on PC to begin with if you don’t want this to happen?


next time maybe just release it on PC to begin with if you don’t want this to happen?


But the fact that they already plan a huge system and try to get mountains of money for it, when they don’t even have a single demonstration system and everything is just guesswork is madness and a sign of how the tech investment system has gone completely off the rails.
This made me laugh and is so true.


Like I said, I’m curious how they’re going to solve the chip issue.
And you’re right, if we went a lot slower, we could plan much better sites, and even do things like have the waste heat, heat the nearby infrastructure. We could even build the infrastructure around them at the same time to plan the usage of that waste heat.


I think you’re really discounting the land cost / time there. The launch centers clearly do have the long lead times and permitting issues just like a data center, but once it’s built it will be able to put up far more compute than the land required of the datacenter before launches are simply replacing things and not putting new things up.
If this does ever actually happen, I’m really curious to see how the chips are going to perform given all the reasons you listed. They could go for the triple redundancy to ensure no errors, but that will greatly reduce their cost effectiveness. How do you even compare 3 results from an AI and know which one of the 3 is wrong or if they all match???
But ya, this whole datacenter AI madness in general is definitely causing problems for something that they still can’t make profitable (maybe they will eventually) in an attempt to meet future demand we don’t even know will fully be there unless they truly solve AI. It is definitely a problem. (edit and we don’t have to be going anywhere near this fast)
edit: sorry I left off, those launch centers will also be able to launch other payloads, so they do have other benefits as well.


Pretty much ya. You’d think after building a 12,000 satellite constellation using reusable 1st stage rockets that is profitable, people would go, oh okay, maybe they can engineer a radiator to deal with the heat problem.


They already deploy 250m^2 solar arrays per satellite on Starlink V3 today, and have launched 52 of these. Yes the will fold. Also they are claiming (but they will need to prove it) that the radiator will be dual piped and 110m^2 as they will run hot. Each of those starlink satellites already needs to reject 22kW of heat.
This version of starship is going to deploy close to 100T.
If you took starship and made it it’s own launch company, it’s launched the 3rd most mass to orbit in 2026 in 2 launches.


Those failures were bad for the program in general and were big things.
These failures were mostly expected.
Its a very different way of doing things, one that the public and congress would have a very hard time with.
You also skipped over the whole nasa and most of the world didnt think it could be done part, so didn’t bother trying. Please give us billions and billions of dollars to do something we don’t think can be done!


Heavily contracted yes, heavily subsidized no.
SpaceX mostly wins contracts that people can bid on, and is usually the lowest bidder. Theres been very little subsidy wise.
Also, NASA unfortunately isn’t capable of doing what SpaceX does, as they are too risk averse because of congress.
They either didnt think you could propulsivly land a orbital rocket, or if you could you could never do it profitably, so they didnt really try.
SpaceX spent billions trying to make it work, billions the tax payers who dont understand shit, would get mad at seeing explosion after explosion. But they kept doing it and succeeded.
Same thing with Starship. Billions building what will hopefully be a fully and rapidly reusable 1st and 2nd stage. They’ve done 15 flight tests and finally got to the point of catching an orbital ship between two chopsticks. You think the taxpayers and congress would have ever let anything get that far watching explosion after explosion as they concurrently build a manufacturing line to churn these things out rapid pace?


The plan is 125kW avg heat, 150kW peak.


Thats why they’re working with Intel and maybe TSMC and probably many other partners.


SpaceX has every incentive to try and make sure nothing bad happens and we lose those 5 years, as they need the full lifespan of those dishes to be profitable.
The only certain way something bad happens is if its war related like Russia saying fuck Starlink and starting the chain of destruction.


A lot of problems get solved by putting it in space that earth bound systems suffer from as well. Land use, permitting, power (gas turbines is the favorite right now), if not gas turbines, land area the sizes of major cities just for solar and batteries, which means more land and more permitting, or pumped hydro for batteries which takes even longer, or a power source like nuclear that takes the longest of them all, actual water for cooling, politics and NIMBY stuff and probably all sorts of other things. That all amounts to a substantial overheard and cost in time.
The heat issue isn’t going to be as big an issue as everyone thinks it’s going to be. They’ve been dealing with heat rejection in space for over a decade, and the V3 starlink’s already work rejecting 22kW of heat. If they think they have a plan to reject 125kW they probably can, and if you solve that, then it will at least physically work. Maybe it turns out to only be 100kW instead of 125kW on the 1st gen dish.
Heat aside they’re going to be very similar to Starlink and they know how to build Starlink.
From there it just comes down to can they make the satellite cheap enough that its increased cost is offset by everything I mentioned at the top (which amounts to a lot of money), and is there enough demand, but both land and space are going to have the same demand issue, so I don’t think you can hold one against the other there. The demand might not be there for any of it, space or land based.
There’s also the unknown environmental cost of all of these constellations burning up in the atmosphere at the end of their lifespan, but that isn’t Starmind or SpaceX specific, its everyone, and we really should be studying it more.


It’d be great if Spain was granting him Aslyum


People said the same thing about Starlink, and it’s economically viable. Never underestimate the power of good engineering. I think the issue will be is there enough demand. Starlink has enough demand.


Please do. I’m begging you!


I didn’t realize the lowest was 600 km, that’s my bad. So starlink is low risk, this not as much.
They plan to put them in Sun Synchronous Orbits (SSO) which I don’t know if they can do that with equatorial orbits?
Edit: this one says as low as 500km, but yes to the higher ones as well, so ideally they’d start at 500km which is the the 5 year range… but the risk will be there whenever they go higher. IMO we really should stay in the 5 year range or less until we have a lot more experience with large constellations.
In its order, the FCC said that these satellites would be deployed “into orbital shells each spanning 50 km at altitudes from 500 to 1,002 km and in 30-degree inclinations and sun-synchronous inclinations.”


My bad, I totally didn’t answer that.
Just because I don’t personally think there is enough demand to make it work, doesn’t mean there isn’t, nor that they can’t somehow drum up future demand. If the dishes are sitting idle too long, that’s why it’ll likely fail IMO.
So I do think it’s feasible in that sense, but we won’t know until they do it.
Re: Pipes. It’ll be more complicated for sure, but so is catching an orbital rocket and ship between 2 chop sticks, so they do have some pretty good engineering capabilities there, so I wouldn’t put that problem past them.
Edit: essentially, I think theyll figure out the hardware and launch it, and if the hardware can reach some threshold % of usage, it could work. I dont think beyond some initial test dishes and time to optimize that even at full usage at a reasonable price, it would still be unprofitable. Im not personally sure theyll reach that %.


A lot of people don’t even think its physically possible at all. They go on and on about how they’ll never be able to cool the hardware etc.
E.g This comment on this post.
Dumbass is gonna get schooled by thermodynamics
A lot of people in other threads seem to often think that they want to build this massive single datacenter instead of it being a large constellation of smaller dishes like starlink, and think it’s impossible because of that.
Personally, I think they’ll be able to design a dish that costs a reasonable amount, and launch it at a reasonable cost, but the actual demand for the product won’t be sufficient for anywhere near the scale they want or need to make it profitable.
Something like Starlink has large ongoing demand, I don’t think these dishes will.


I do kind of enjoy it. It’s a good gauge of what kind of people are on a thread.
The chalk appears to have much power!